The call came from my contractor early this morning. The tub was being installed in our new master bedroom this morning and he needed our faucet and fixtures ASAP to get everything installed. WTF! Does he think we can just stop what we are doing and run and get these things at the drop of a hat? What part of "give us a couple of days notice before you need anything so we can purchase or order" does he not understand?
This is the third time he has done this to us. The first time was with the tub, the second time with the front door, and now it is the bathroom fixtures. Tell me what you need and when and I will buy it for you. Part of doing this addition is because we don't have enough space. We don't have the room to simply store a new bathtub, two vanities, four ceiling fans, closet doors, two entry doors, tile, light figures, etc.
We meet with a lighting vendor Friday. I hope our contractor can wait that long. Speaking of lights, the lights and fans being installed in the addition are still not placed correctly. Grrr.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment